New homes · Independent inspection

A new home. A closer look.

New-build snagging surveys across Yorkshire and the North West, from Huddersfield and independent of your developer. A careful inspection, a photographed record and a clear list of what needs attention.

Fee
Fixed quote before you commit
Defect schedule
Normally within 3–⁠5 working days
Snagging survey: a new-build home with every defect tagged for the developerFront elevation of a just-finished brick house with a projecting front gable, interlocking concrete tiles, white uPVC windows and a door canopy, with a tarmac drive, a paved path and newly laid turf in front, a close-board side fence and a PLOT 14 peg. Seven numbered ochre stickers mark the snags in schedule order: a cracked ridge tile, an open gutter joint, a break in the window-frame sealant, missing mortar perpends, protective film left peeling from a window frame, a cracked manhole cover and turf seams left open beside the path.PLOT 141234567
  1. Cracked ridge tile
  2. Open gutter joint
  3. Break in the window-frame sealant
  4. Missing mortar perpends
  5. Protective film left on a window frame
  6. Cracked manhole cover
  7. Turf seams left open beside the path
Fig. 1 · New-build snaggingIllustrative. Look, record, explain: from the visible detail to the next practical step.

01 · Your stage

Where are you in the move?

The right scope depends on whether you are waiting for the keys, living in the home or reviewing unresolved problems. The appointment should fit your circumstances, not just the age of the property.

  1. Before you get the keys

    Pre-completion snagging survey

    Understand the inspection window, agree access and record outstanding items before handover.

    Main purpose
    Record accessible condition before legal completion, within the permitted inspection arrangements.
    Before you book
    Confirm developer access, the applicable checklist and the inspection window. This is not automatically the same scope as a full post-completion visit.
    Read this stage’s guidance
  2. Just moved in

    Post-completion snagging survey

    A room-by-room inspection and a photographed schedule that turns concerns into clear actions.

    Main purpose
    Document visible workmanship, operation and concerns once you have the keys.
    Before you book
    Share handover records and known defects. Confirm safe access and which services are connected.
    Read this stage’s guidance
  3. Before your builder period ends

    Builder-warranty snagging survey

    Review unresolved concerns and document new observations before the relevant reporting deadline.

    Main purpose
    Bring outstanding, recurring and newly observed concerns into a clear current record.
    Before you book
    Check your actual policy dates and bring earlier reports, notification records and repair history.
    Read this stage’s guidance

Not sure which applies? Request a snagging survey quote. Already spotted damage or a serious concern? Report it promptly. You do not need to wait for an inspection before telling the developer.

02 · The inspection

More than a list of paint blemishes.

A useful inspection considers how visible elements have been fitted and how they work together. It distinguishes finishing issues from concerns that need further investigation.

Try the room-by-room checklist

  1. 01

    Inside the home

    Doors and windows, accessible finishes, stairs, fitted kitchens and sanitaryware. We look at condition, installation and operation where practical.

  2. 02

    Outside the home

    Visible walling, pointing, rainwater goods, ground-level roof views, accessible paths, boundaries and external levels within the agreed property scope.

  3. 03

    Roof space and ventilation

    Accessible roof-space observations where entry is safe and permitted: visible insulation, ventilation routes and workmanship. Restrictions are recorded.

  4. 04

    Services and further checks

    Visible service installations and signs of leakage or incomplete work. Specialist testing, drainage CCTV, drone work and thermal imaging require an agreed additional scope.

A clear scope, before we start.

Inspection is visual and non-invasive. We do not open up construction, move heavy furniture or enter unsafe areas. It is not certification of electrical, gas, fire or structural safety. Pre-completion access can be more restricted. Developers registered with the New Homes Quality Board must offer a pre-completion inspection under the New Homes Quality Code, and you can appoint a suitably qualified inspector to carry it out. The agreed terms explain what can be checked.

From the survey archive

Finishes, fittings and fixings.

Glazing seals, safety-glass markings, door hardware, thresholds and fixings: the kind of detail a snagging list records.

A black glazing gasket has pulled back from the corner of a white window frame, leaving a visible gap.

A gap at a glazing gasket corner

A gap where the black glazing gasket has pulled back from the frame corner.

A marking identifying toughened safety glass is visible near the corner of a glazed frame.

Safety-glass marking

A toughened safety-glass marking near the corner of a pane.

A fine crack extending above the hinge recess in a painted internal door frame.

Cracking beside a door hinge

A fine crack extending up from the hinge recess in a painted door frame.

A cracked and broken light-coloured hinge cover beside a white external door leaf and frame.

Broken door hinge cover

A broken door hinge cover exposing the metal fitting beneath.

A broken white strip along the lower door frame, exposing the dark seal above the threshold.

Broken strip at a door threshold

A broken strip along the lower door frame, exposing the dark seal beneath.

Two empty screw holes in a black strap hinge fitted to a timber gate.

Missing screws in a gate hinge

Two missing fixing screws on the gate side of a strap hinge.

Photographs from our survey archive.

Explore the full photograph collection

Survey photograph

Survey archive photograph

04 · The record

See what makes a finding useful.

Read the numbered record to see how location, observation, evidence and follow-up fit together.

01 · Location

Make the item easy to find.

A room name and precise position let the developer find the same window. Keep the item number unchanged in later emails.

02 · Observation

Describe what happened.

Record the behaviour you actually observed. Avoid guessing the cause or forcing the fitting to demonstrate a problem.

03 · Evidence

Give the detail some context.

Use a wider image to identify the location, then a close-up of the concern. Date the record and note relevant conditions.

04 · Next step

Keep the action and outcome separate.

Ask for a response and proposed remedy. Record the repair date and subsequent outcome; attendance alone does not establish resolution.

Our own illustration. Not a client report, official checklist or warranty decision.

Try the illustrated new-build snagging checklist
Illustrative

New home · item 014 · operation · window

A window that catches.

A clear observation, ready to follow up.

  1. 01

    Location

    014 · First floor · rear bedroom · opening window beside wardrobe

  2. 02

    Observation

    The opening section catches on the frame during normal closing. The cause has not been established.

  3. 03

    Evidence

    Photo A: window within the room. Photo B: the contact point. Photographs would accompany a real inspection record.

  4. 04

    Next step

    Developer to investigate and confirm the remedy. Record the response, the appointment, the work completed and the outcome checked.

Illustrative field record. Illustrative content only · no property inspected.

Your photographed schedule records observations, recommended actions and access limitations. The example above explains the structure; the findings and scope of your own inspection depend on the property and the agreed scope.

05 · From enquiry to action

A straightforward route through the snag list.

From first enquiry to a tracked repair list.

  1. Step 1

    Agree the brief

    Send the property details, your stage and any deadline. We confirm coverage, scope, fee and availability.

  2. Step 2

    Inspect and document

    Arrange access and share known concerns. We inspect the accessible areas and record what we find.

  3. Step 3

    Report and prioritise

    Receive the photographed schedule and ask questions about the findings. Confirm reporting dates when booking.

  4. Step 4

    Track the response

    Send the report to the developer, retain acknowledgement and track repairs. Discuss a separate return visit if needed.

From Huddersfield, across the region.

We welcome snagging enquiries across Yorkshire and the North West, including Huddersfield, Leeds, Bradford, Wakefield, Sheffield and Manchester. Appointment availability and travel are confirmed for your postcode.

Tell us whether it is a house or apartment, its approximate size, the development and plot number, and whether you have the keys.

Check our coverage

06 · Questions

Good questions, before you book.

How much does a snagging survey cost?

We provide a fixed quote for the property and agreed scope. Send the postcode, property type, number of bedrooms, completion stage and access arrangements. An apartment, a detached house and a return visit need different allowances; additional testing is not assumed to be included.

How long does the inspection and report take?

Allow typically two to four hours on site, depending on size and access, with the defect schedule normally within three to five working days. Confirm the appointment and report date with us before relying on a completion or reporting deadline.

Can the developer refuse access before completion?

If your developer is registered with the New Homes Quality Board, the New Homes Quality Code requires it to give you the opportunity of a pre-completion inspection, after the notice to complete has been served and before completion (or earlier if you both agree). You can carry it out yourself or appoint a suitably qualified inspector, and it follows the NHQB’s standard pre-completion inspection checklist. The developer can refuse entry to an inspector it does not consider suitably qualified, and which version of the Code applies depends on your reservation date: version 2 applies to reservations from 2 March 2026. If your developer is not registered, or a suitable appointment cannot be agreed, book the inspection as soon as possible after you get the keys — your contractual and warranty rights still apply, and the New Homes Ombudsman is available for complaints about registered developers.

Is a snagging survey a structural survey?

No. It is an inspection of a new home within an agreed scope, not a full structural investigation, Building Regulations approval or a guarantee that the property is defect-free. Serious concerns may need further investigation.

Can you inspect a new-build apartment?

Tell us about the apartment, floor, access and any shared areas you want considered. The dwelling inspection does not automatically include the whole block, communal systems, external-wall assessment or a fire-risk assessment.

Do I still need a survey if there is a warranty?

A warranty and an independent inspection do different jobs. An inspection documents accessible condition for you; warranty cover depends on the policy. Neither means every part of the home has been examined or that every defect is covered.

Do you return after the builder has carried out repairs?

A re-inspection can be arranged and quoted separately. Share the original numbered schedule and the developer’s completion list so the return visit can focus on the work said to have been finished.

Another question? Call 01484 218579 or Request a snagging survey quote.

Our clients review us on Google rather than on this site. Read our reviews on Google 

07 · Official documents, free to read

Start with the right checklist.

These documents serve different purposes. Use the source that matches your purchase stage and applicable scheme, alongside your own records.

NHBC · Moving in

A homeowner’s new-home checklist

A short inside-and-outside checklist for your own observations around moving in. NHBC states that this guidance is not part of its Standards or Buildmark policy; it does not establish warranty cover.

Understanding and following up

Guidance beyond the tick boxes

Read NHQB’s homeowner guide to snagging. For NHBC policyholders, NHBC also provides templates for notifying the builder, chasing a response and making a formal complaint.

Official documents remain on their publishers’ websites. Our interactive checklist is an independent organising aid, not a replacement for the prescribed NHQB inspection checklist. Links reviewed 7 November 2026.

Plan your inspection

Further reading

For your purchase, check the applicable code and policy — not just a general description of a “two-year warranty”.

  1. NHQB: choose the applicable Code
  2. NHBC: how Buildmark cover is structured
  3. Our new-build buyer’s guide
  4. Our page on new-build defects after two years

Guidance reviewed 7 November 2026.

Moving into a new-build home?

Know what needs attention. Know what to do next.

Send your postcode, property details and completion stage. We will confirm the appropriate inspection and a fixed quote.

Fixed quote before you commit

We aim to reply within one working day.