Before your builder period ends

Builder-warranty snagging reviews

A review before the builder-responsibility period ends brings earlier reports, recurring problems and newly visible concerns into one clear record.

Fee
Fixed quote for your agreed scope
Defect schedule
Normally within 3–⁠5 working days

The important next step

Check your policy dates now. Leave time for inspection, reporting and written notification.

Yorkshire and the North West

01 · Preparation

Have these details ready.

We inspect new homes across Yorkshire and the North West, and confirm the inspection scope, fee, access and report timing before you commit.

  1. Warranty certificate and relevant policy wording
  2. Original inspection report and dated correspondence
  3. Repair history, photographs and unresolved items
  4. The deadline and any formal complaint reference

Request a quoteRequest a snagging survey quoteSee the inspection scope

Snagging survey: a new-build home with every defect tagged for the developerFront elevation of a just-finished brick house with a projecting front gable, interlocking concrete tiles, white uPVC windows and a door canopy, with a tarmac drive, a paved path and newly laid turf in front, a close-board side fence and a PLOT 14 peg. Seven numbered ochre stickers mark the snags in schedule order: a cracked ridge tile, an open gutter joint, a break in the window-frame sealant, missing mortar perpends, protective film left peeling from a window frame, a cracked manhole cover and turf seams left open beside the path.PLOT 141234567
  1. Cracked ridge tile
  2. Open gutter joint
  3. Break in the window-frame sealant
  4. Missing mortar perpends
  5. Protective film left on a window frame
  6. Cracked manhole cover
  7. Turf seams left open beside the path
Fig. 1 · New-build snaggingIllustrative. Seven numbered snags, recorded in schedule order for the developer.

02 · Guidance

Practical guidance for this stage.

A home changes as it settles into use.

Check the actual deadline first

Find your warranty certificate and policy booklet, together with the completion date and original handover record. Do not assume that every item has the same reporting window. Tell us the date you are working towards when enquiring. If it is close, notify the developer of known concerns now rather than waiting for an appointment.

Bring the history, not just the latest photograph

An issue that has returned after repair needs a different conversation from a newly noticed blemish. Share the original report, emails, repair dates and the developer’s explanations. This helps distinguish outstanding work, recurrence and new observations without treating every hairline crack as evidence of structural movement.

Use the review to make the record clearer

We can inspect accessible areas and record the condition found within the agreed scope. The review may identify a need for further investigation, monitoring or a specialist test. It cannot retrospectively prove a concealed defect existed at completion, determine legal liability or guarantee acceptance under a warranty.

Separate the inspection from the complaint

An inspection report is technical evidence, not a warranty claim or an ombudsman decision. Submit concerns through the developer’s process, keep delivery records and ask for a written response. If unresolved, check the warranty provider’s procedure and any applicable consumer-code route. Further technical support can be discussed separately.

Two years is not a universal guarantee

NHBC describes a usual two-year builder warranty period, followed by different insurance cover. Other schemes and policy versions vary. Check what is covered, when it must be reported and the procedure for seeking help.

Read the official guidance

03 · Questions

A little more clarity.

Is this an “end of warranty” inspection?

It is a review before the relevant builder-responsibility period ends. Calling it the end of the whole warranty can be misleading: some cover may continue under different terms.

What if I already reported an issue?

Keep the dated notification and repair history. A later inspection can document the current condition, but does not replace the earlier evidence or decide whether the developer remains responsible.

Can you guarantee the developer will fix everything?

No. The report provides independent observations and recommendations. Responsibility and the remedy depend on the facts, contract, applicable standards and policy terms.

Another question? Call 01484 218579 or Request a snagging survey quote.

Our clients review us on Google rather than on this site. Read our reviews on Google 

04 · Follow-up

A clear record. A practical follow-up.

Keep the original report unchanged and use its item numbers in a separate repair record.

  1. Step 1

    Locate it

    Record the room, exact position and date. Take a wider photograph for context and a close-up where safe.

  2. Step 2

    Describe it

    Explain what you observed and when it happens. Note rain, normal use or recurrence after repair without assuming the cause.

  3. Step 3

    Send and retain

    Notify the developer, keep a copy and request acknowledgement, a response to each item and proposed dates.

  4. Step 4

    Check the outcome

    Record attendance separately from resolution. Keep repair details and flag anything that remains or returns.

Worth knowing

A technical report does not submit a complaint or warranty claim for you. If a concern could be dangerous, keep clear and seek appropriate urgent help rather than waiting for a routine inspection.

05 · Official documents, free to read

Start with the right checklist.

These documents serve different purposes. Use the source that matches your purchase stage and applicable scheme, alongside your own records.

NHBC · Moving in

A homeowner’s new-home checklist

A short inside-and-outside checklist for your own observations around moving in. NHBC states that this guidance is not part of its Standards or Buildmark policy; it does not establish warranty cover.

Understanding and following up

Guidance beyond the tick boxes

Read NHQB’s homeowner guide to snagging. For NHBC policyholders, NHBC also provides templates for notifying the builder, chasing a response and making a formal complaint.

Official documents remain on their publishers’ websites. Our interactive checklist is an independent organising aid, not a replacement for the prescribed NHQB inspection checklist. Links reviewed 7 November 2026.

06 · The record

See what makes a finding useful.

Read the numbered record to see how location, observation, evidence and follow-up fit together.

01 · Location

Make the item easy to find.

A room name and precise position let the developer find the same window. Keep the item number unchanged in later emails.

02 · Observation

Describe what happened.

Record the behaviour you actually observed. Avoid guessing the cause or forcing the fitting to demonstrate a problem.

03 · Evidence

Give the detail some context.

Use a wider image to identify the location, then a close-up of the concern. Date the record and note relevant conditions.

04 · Next step

Keep the action and outcome separate.

Ask for a response and proposed remedy. Record the repair date and subsequent outcome; attendance alone does not establish resolution.

Our own illustration. Not a client report, official checklist or warranty decision.

Try the illustrated new-build snagging checklist
Illustrative

New home · item 014 · operation · window

A window that catches.

A clear observation, ready to follow up.

  1. 01

    Location

    014 · First floor · rear bedroom · opening window beside wardrobe

  2. 02

    Observation

    The opening section catches on the frame during normal closing. The cause has not been established.

  3. 03

    Evidence

    Photo A: window within the room. Photo B: the contact point. Photographs would accompany a real inspection record.

  4. 04

    Next step

    Developer to investigate and confirm the remedy. Record the response, the appointment, the work completed and the outcome checked.

Illustrative field record. Illustrative content only · no property inspected.

07 · Plan your next step

The right help, at the right stage.

Before your builder period ends

Builder-warranty snagging survey

Review unresolved concerns and document new observations before the relevant reporting deadline.

Next step. Check your policy dates now. Leave time for inspection, reporting and written notification.

Not sure which applies? Request a snagging survey quote. Already spotted damage or a serious concern? Report it promptly. You do not need to wait for an inspection before telling the developer.

Other stages

Free resources

Guidance reviewed 7 November 2026. Access, code protection and warranty terms depend on your home and circumstances.

Builder period ending soon?

Bring every concern into one clear record.

Send your policy dates, the earlier reports and the deadline you are working to. We confirm the inspection scope, fee, access and report timing before you commit.

Fixed quote before you commit

We aim to reply within one working day.