Before you get the keys

Pre-completion inspections

An independent pre-completion inspection records the condition and finish of the home before you take ownership.

Fee
Fixed quote for your agreed scope
Defect schedule
Normally within 3–⁠5 working days

The important next step

Arrange the visit with the developer before booking removal dates around it.

Yorkshire and the North West

01 · Preparation

Have these details ready.

We inspect new homes across Yorkshire and the North West, and confirm the inspection scope, fee, access and report timing before you commit.

  1. Reservation date and developer’s legal name
  2. Notice to complete or latest proposed date
  3. Written access arrangements and site contact
  4. Plot plans, specification and any agreed extras

Request a quoteRequest a snagging survey quoteSee the inspection scope

Snagging survey: a new-build home with every defect tagged for the developerFront elevation of a just-finished brick house with a projecting front gable, interlocking concrete tiles, white uPVC windows and a door canopy, with a tarmac drive, a paved path and newly laid turf in front, a close-board side fence and a PLOT 14 peg. Seven numbered ochre stickers mark the snags in schedule order: a cracked ridge tile, an open gutter joint, a break in the window-frame sealant, missing mortar perpends, protective film left peeling from a window frame, a cracked manhole cover and turf seams left open beside the path.PLOT 141234567
  1. Cracked ridge tile
  2. Open gutter joint
  3. Break in the window-frame sealant
  4. Missing mortar perpends
  5. Protective film left on a window frame
  6. Cracked manhole cover
  7. Turf seams left open beside the path
Fig. 1 · New-build snaggingIllustrative. Seven numbered snags, recorded in schedule order for the developer.

02 · Guidance

Practical guidance for this stage.

A new-home demonstration has a different purpose: it shows you how the house works.

Start with the right inspection

Tell us your reservation date, developer, plot number and proposed completion date. Developers registered with the New Homes Quality Board must offer a pre-completion inspection under the New Homes Quality Code, and you can appoint a suitably qualified inspector to carry it out. Where the Code applies, the formal pre-completion inspection follows its checklist. We confirm the applicable scope and access arrangements before you book; this is not automatically the same inspection as a wider post-completion snagging survey.

Make the access arrangements explicit

Ask the developer for a written appointment, the permitted inspection duration, site-safety requirements and confirmation that the home will be ready to inspect. Tell us about incomplete work, disconnected services or rooms that will not be accessible. A visit to a house still being finished can leave important items unassessed.

Put the findings in the right hands

Send the inspection record to the developer’s customer-care team and retain the acknowledgement. Ask which items will be resolved before handover, which need later appointments and who owns each action. Share serious concerns promptly with your conveyancer; the inspection does not itself suspend your contractual completion obligations.

Keep a separate handover record

On the day you receive the keys, record meter readings, supplied keys, manuals and certificates. Photograph visible damage before moving furniture in. Keep this record alongside the inspection report so newly noticed damage and previously reported items can be distinguished.

Which Code applies?

NHQB distinguishes reservations before 2 March 2026 from those on or after that date. Developer registration and activation also matter. Check the applicable version rather than assuming that every new home has identical inspection rights.

Read the official guidance

03 · Questions

A little more clarity.

Is this the same as the developer’s home demonstration?

No. A demonstration explains operation and maintenance. An inspection records condition against its agreed scope. Arrange enough time for each rather than assuming one appointment covers both.

Can an inspection stop completion?

Do not rely on the inspection to delay completion or withhold money. Take advice from your conveyancer about the contract and any serious findings.

What if access is not agreed?

Ask the developer to explain its position in writing and check the applicable code with your conveyancer. We can discuss an early post-completion visit if a suitable appointment cannot be arranged.

Another question? Call 01484 218579 or Request a snagging survey quote.

Our clients review us on Google rather than on this site. Read our reviews on Google 

04 · Follow-up

A clear record. A practical follow-up.

Keep the original report unchanged and use its item numbers in a separate repair record.

  1. Step 1

    Locate it

    Record the room, exact position and date. Take a wider photograph for context and a close-up where safe.

  2. Step 2

    Describe it

    Explain what you observed and when it happens. Note rain, normal use or recurrence after repair without assuming the cause.

  3. Step 3

    Send and retain

    Notify the developer, keep a copy and request acknowledgement, a response to each item and proposed dates.

  4. Step 4

    Check the outcome

    Record attendance separately from resolution. Keep repair details and flag anything that remains or returns.

Worth knowing

A technical report does not submit a complaint or warranty claim for you. If a concern could be dangerous, keep clear and seek appropriate urgent help rather than waiting for a routine inspection.

05 · Official documents, free to read

Start with the right checklist.

These documents serve different purposes. Use the source that matches your purchase stage and applicable scheme, alongside your own records.

NHBC · Moving in

A homeowner’s new-home checklist

A short inside-and-outside checklist for your own observations around moving in. NHBC states that this guidance is not part of its Standards or Buildmark policy; it does not establish warranty cover.

Understanding and following up

Guidance beyond the tick boxes

Read NHQB’s homeowner guide to snagging. For NHBC policyholders, NHBC also provides templates for notifying the builder, chasing a response and making a formal complaint.

Official documents remain on their publishers’ websites. Our interactive checklist is an independent organising aid, not a replacement for the prescribed NHQB inspection checklist. Links reviewed 7 November 2026.

06 · The record

See what makes a finding useful.

Read the numbered record to see how location, observation, evidence and follow-up fit together.

01 · Location

Make the item easy to find.

A room name and precise position let the developer find the same window. Keep the item number unchanged in later emails.

02 · Observation

Describe what happened.

Record the behaviour you actually observed. Avoid guessing the cause or forcing the fitting to demonstrate a problem.

03 · Evidence

Give the detail some context.

Use a wider image to identify the location, then a close-up of the concern. Date the record and note relevant conditions.

04 · Next step

Keep the action and outcome separate.

Ask for a response and proposed remedy. Record the repair date and subsequent outcome; attendance alone does not establish resolution.

Our own illustration. Not a client report, official checklist or warranty decision.

Try the illustrated new-build snagging checklist
Illustrative

New home · item 014 · operation · window

A window that catches.

A clear observation, ready to follow up.

  1. 01

    Location

    014 · First floor · rear bedroom · opening window beside wardrobe

  2. 02

    Observation

    The opening section catches on the frame during normal closing. The cause has not been established.

  3. 03

    Evidence

    Photo A: window within the room. Photo B: the contact point. Photographs would accompany a real inspection record.

  4. 04

    Next step

    Developer to investigate and confirm the remedy. Record the response, the appointment, the work completed and the outcome checked.

Illustrative field record. Illustrative content only · no property inspected.

07 · Plan your next step

The right help, at the right stage.

Before you get the keys

Pre-completion snagging survey

Understand the inspection window, agree access and record outstanding items before handover.

Next step. Arrange the visit with the developer before booking removal dates around it.

Not sure which applies? Request a snagging survey quote. Already spotted damage or a serious concern? Report it promptly. You do not need to wait for an inspection before telling the developer.

Other stages

Free resources

Guidance reviewed 7 November 2026. Access, code protection and warranty terms depend on your home and circumstances.

Completion date set?

Record the home before you take ownership.

Send your reservation date, developer, plot number and proposed completion date. We confirm the inspection scope, fee, access and report timing before you commit.

Fixed quote before you commit

We aim to reply within one working day.