Reinstatement project management

Settling the claim is only half of it.

Request a reinstatement project management quoteExplore the scope

The scope and fee are agreed before you commit.

Reinstatement project management: a fire-damaged room rebuilt stage by stage, inspected before cover-upOne bedroom corner drawn four times after a house fire: stripped out, with soot fanning up from the window and charred joists in their pockets; new full-span joists in hangers, the nearest checked by torch before cover-up; boarded and plastered; then decorated. Below, a track ticks each inspection, each payment just behind it, the last still pending.£Strip-out£New joists inspected£Board & plaster£Sign-off
  • Strip-out
  • New joists inspected
  • Board & plaster
  • Sign-off
  1. Strip-out
  2. New joists inspected
  3. Board & plaster
  4. Sign-off
Fig. 1 · Rebuild after a fireIllustrative. A fire-damaged room rebuilt stage by stage, each stage inspected before cover-up and each payment released after its inspection.

01 / Your situation

Who this service is for

Then your home has to actually be rebuilt: contractors chosen, works sequenced, quality checked and payments staged. It usually happens while you are living somewhere else and just want your life back.

Reinstatement project management puts independent construction expertise in your corner for that whole process. We draw on our team’s combined experience of contracting operations and complex reinstatement work from the insurer’s side. We know how building works should be run, and all the ways they quietly go wrong when nobody independent is watching.

From confirming the final scope through to snagging and the final inspection, the job is simple to state. Get your home rebuilt properly, to the agreed scope, without you having to become a construction expert overnight.

Our role is your independent adviser and inspector. We confirm the scope, help you choose a contractor, inspect the works at agreed stages, value the work done before each staged payment and inspect the finished job.

The building contract is between you and the contractor, who stays responsible for running the site, its safety and the quality of the work. Acting as contract administrator under that contract, or taking on a legal dutyholder role, is a separate appointment. It is only part of the service if the terms of engagement say so.

  • Homeowners with an agreed settlement facing a rebuild they do not feel equipped to run
  • Policyholders taking a cash settlement who need the works scoped, tendered and overseen
  • Anyone whose insurer-appointed contractor has failed, stalled or been dismissed part-way through
  • Owners who simply want independent oversight of a reinstatement the insurer is managing

What the service covers

  • Confirming the reinstatement scope before works start, so nothing is missed or quietly value-engineered away
  • Obtaining and comparing contractor quotes on a like-for-like basis, and advising on selection
  • Programme and sequencing oversight — the right trades, in the right order, for the right reasons
  • Staged quality inspections during the works, with issues raised while they are still easy to fix
  • Valuations of the work done before you release each staged payment, so payments stay in step with progress
  • A snagging inspection and a final inspection report against the agreed scope
Scope limits
  • The building work itself: we do not carry out repairs, which is exactly what keeps the oversight independent
  • Architectural design and planning applications — where design input is needed, the right professionals are recommended
  • Negotiating your settlement with the insurer: we do not negotiate claims on anyone’s behalf, which is an FCA-regulated activity. If you need independent technical evidence to support your own negotiation, that is available through insurance claims consultancy
  • The principal designer and principal contractor roles under the Construction (Design and Management) Regulations 2015 and the Building Regulations. We do not accept either role unless it is agreed in writing. If nobody is appointed in writing, the law assigns them by default, and that can include whoever prepares the scope. So make sure your building contract names who holds them before works start (see the questions below)

From the survey archive

Water, timber and finishes.

A wet meter indication beside darkened timber, a moisture check beside peeling paint and damaged plaster, cracked tiles beside a wet-room drain and a lifting surface at the bottom of a door, from our survey archive. They come from our wider survey work, not from a reinstatement we managed.

A moisture meter displays a wet indication at a timber and wall junction, beside visible surface droplets and dark marks.

Moisture-meter indication at a timber junction

A moisture meter displaying a wet indication beside darkened timber and surface droplets.

A moisture meter used beside peeling paint and damaged wall decoration.

Moisture check beside peeling paint

Peeling paint and damaged plaster beside a doorway, with a moisture meter held against the wall.

Cracked floor tiles and open joints around a wet-room floor drain.

Cracked floor tiles beside a drain

Cracked floor tiles and open joints beside a wet-room drain.

Lifting surface material and a split at the lower corner of a timber door.

Deterioration at the bottom of a door

A lifting, rough surface on the lower door rail and a split at the bottom corner.

Photographs from our survey archive.

Explore the full photograph collection

Survey photograph

Survey archive photograph

Our approach / Evidence before conclusions

How it works

  1. Scope and plan

    The agreed reinstatement scope is reviewed and confirmed, gaps flagged, and the works packaged so contractors can price them properly.

  2. Contractor selection

    Quotes are obtained and compared like-for-like, references and insurances checked, and a recommendation made — the decision stays yours.

  3. Works oversight

    Staged site inspections at the points that matter — before things get covered up, not after. Short written updates in plain English follow each visit.

  4. Completion inspection

    A snagging inspection, a defects list the contractor works through, and a final inspection report against the scope before you release the last payment.

Project control boardIllustrative
01 · Set briefScope

Purpose, constraints and responsibilities are fixed early.

02 · Track riskRisk

Technical and delivery risks stay visible between stages.

03 · Record gateDecide

Evidence is converted into accountable decisions.

The most expensive moment in any reinstatement is the one where money gets ahead of work done. Staged valuations exist to stop that: we recommend a payment only against work we have inspected.

Before you decide

A clearer brief.
A useful answer.

Tell us what you have noticed, what has already been checked and what decision you need to make. We’ll confirm where we can help.

Discuss your property

Read our reviews on Google

My insurer wants to use its own contractors. Can you still be involved?

Yes. Even where the insurer manages the works, you are entitled to satisfy yourself about quality. Independent staged inspections and a snagging report give you evidence rather than unease if standards slip — and insurers respond to documented defects far faster than to complaints.

I have taken a cash settlement. Where do I start?

With the scope. Before any contractor is approached, the reinstatement scope is confirmed so that quotes are complete and comparable. Tendering from a defined scope is the single biggest protection a cash-settled policyholder has.

What if the contractor and I disagree mid-project?

That is much of the point of independent oversight: disagreements get resolved by reference to the agreed scope and proper standards, documented in writing, rather than by whoever argues loudest on site.

How much of my time will this take?

As little as you want. Most clients settle into a rhythm of a short update after each inspection and a decision from you only when one is genuinely needed — contractor selection, finish choices, payment releases.

Are you a project manager or a contract administrator?

We act as your independent adviser and inspector, which is what “project management” means on this page: confirming the scope, comparing quotes, inspecting at agreed stages, valuing work before staged payments and inspecting the finished works. A contract administrator is the person named in the building contract to issue instructions and certificates under it. We take that role only if it is agreed in writing at the outset; otherwise our valuations and reports advise you, and you make the payments and decisions under your contract with the builder. A written building contract helps too: JCT publishes contracts written for homeowners, with and without a consultant overseeing the work.

Who is responsible for health and safety and the Building Regulations?

The Construction (Design and Management) Regulations 2015 apply to work on your own home. As a domestic client, your client duties normally pass to the contractor, or to the principal contractor where there is more than one contractor, unless you agree in writing that the principal designer will take them on. Where more than one contractor will work on the project, a principal designer and a principal contractor are required; if you do not appoint them, the designer in control of the pre-construction phase and the contractor in control of the construction phase take those roles by default. Since October 2023 the Building Regulations have had a similar dutyholder regime for compliance with the regulations. We do not accept either role unless it is agreed in writing in our terms of engagement. If nobody is appointed in writing, the law assigns the roles by default, and that can include whoever prepares the scope of works, because a specification counts as design under the 2015 Regulations. So make sure your building contract names who holds each role before works start.

Follow the detail

Keep exploring.

Does home insurance cover damp?How subsidence claims actually work: a step-by-step guideDoes home insurance cover subsidence?
Related services
The standards behind this service

Rebuilding after a loss?

Put the building back properly.

Send the property address and explain the situation. We’ll confirm the appropriate scope, fee and next step.

Request a reinstatement project management quoteOr call 01484 218579

We aim to reply within one working day.