Guides · 8 on this topic

Understanding survey reports. Read the report without panicking.

What each RICS Home Survey level covers and which one fits the house, what happened to the HomeBuyer Report, what a surveyor looks for on the day, what a Level 2 survey cannot see, and how to read a report calmly once it arrives.

Advice
Independent
Quotes
Fixed quote before you commit
Understanding survey reportsExploded isometric plate: three sheets of a survey report fan upward on the left, the cover sheet on top with a title block, a rating key of three tag-shaped cut-outs and typeset text. Three condition-rating tags have lifted out of the key and hang in a column, each tied to a marker dot on a two-storey stone house on a plinth to the right: a highlighted 3 to two slipped slates on the roof, a 2 to the front corner where the pointing has weathered open, and a 1 to the sound stone plinth at the foot of the wall. A small surveyor with a clipboard stands on the plinth in front of the door, facing the house.321Survey reportSlipped slatesCondition ratings
  • Survey report
  • Condition ratings
  • Slipped slates
  1. Survey report
  2. Condition ratings
  3. Slipped slates
Fig. 1 · Understanding survey reportsIllustrative. Understanding survey reports.

01 · Guides

8 guides on understanding survey reports.

02 · Free tools

Check your own property.

03 · Related services

When reading is not enough.

04 · All topics

Browse the other topics.

Need a surveyor to look at it?

A building question deserves a reasoned answer.

Send the address and the situation. You will get an honest view on the right service and a fixed quote before committing.

Level 2 from £335 · Level 3 from £570

We aim to reply within one working day.