What is a schedule of condition, and when do you need one?

A schedule of condition is a dated record of a building before something changes. When it helps, what a good one contains, who prepares it, and how it relates to party wall work.

Start here

A schedule of condition is a dated record of the condition of a building, or part of one, at a point in time: written descriptions of what is there, backed up by referenced photographs. Its job is to settle a later argument before it starts. If a crack appears next door after building work, or a landlord and tenant disagree about what state a property was in at the start of a lease, a good schedule shows what was there before. This guide explains when one is worth having, what it should contain, and who should prepare it.

Regulatory framework and building regulationsExploded isometric plate of a single-storey rear extension slid a short way off its hatched footprint at the back of a two-storey stone house with a slate roof and gable chimney. The house rear wall has a new structural opening with a steel over it; the extension has glazed garden doors, a side window, a rooflight and a flat roof built up to a cross-hatched, stone-coped party fence wall on the boundary. An ochre dimension on the ground, running from the rear wall to under the extension, marks the 3.0 m projection; a building control inspector with a clipboard stands at the corner of the slab facing the doors, and a Building Control certificate stamped APPROVED is pinned to the top right of the sheet.3.0 mRear extensionSteel over openingParty fence wallBuildingControlApproved
  • Rear extension
  • Steel over opening
  • Party fence wall
  1. Rear extension
  2. Steel over opening
  3. Party fence wall
Fig. 1 · Regulatory frameworkIllustrative. Regulatory framework and building regulations.
Contents6 sections

When a schedule of condition helps

Party wall work

The most common use is under the Party Wall etc. Act 1996. When work that the Act covers goes ahead and the neighbours dispute it, or don’t reply in time, the appointed party wall surveyor or surveyors draw up an award setting out how the work will be done. A record of the condition of the neighbouring property is usually made before the work starts, so that any damage the work causes can be told apart from what was already there. Our guide to party wall agreements explains the process, and the party wall notice checker shows whether the Act is likely to apply to what you’re planning.

Building work next door that the Act doesn’t cover

Plenty of building work near a boundary sits outside the Act: work that doesn’t touch a party wall, excavation further away than the Act’s distances, a large development on the next plot, demolition, or heavy traffic and plant on a narrow street. If you’re worried about your own home, a record made before the work starts is the evidence you’d want if you later had to show that damage was new.

Before your own building work

If you’re about to build an extension or carry out major alterations, recording the condition of your own house, and of the neighbouring walls you can see, protects you as well as them. It is also a useful baseline for independent inspections while the work is done.

Leases

A schedule of condition is often attached to a commercial lease to record the state of the premises when the tenant takes them on. Depending on the lease, it can limit what the tenant has to put right at the end. If you’re signing a lease that refers to one, your solicitor should check how it is worded, because that decides how it is used.

Insurance claims

After damage from a fire, flood or escape of water, a dated record of what the property was like, or of the damage before repairs start, is useful evidence for the claim file. See insurance claims consultancy.

What a good schedule contains

A schedule is only as useful as it is clear and specific. A good one includes:

  • the date, the time and the weather, and who was present;
  • the scope: which rooms, elevations, walls and outbuildings were recorded, and what couldn’t be seen;
  • room-by-room and elevation-by-elevation descriptions, in a consistent order;
  • existing defects described precisely: where a crack is, which way it runs, how long it is and how wide, plus stains, damp patches, bulges, gaps and damaged finishes;
  • photographs referenced to the descriptions, so each one can be matched to the right wall and the right defect, ideally with a scale or a crack-width gauge in shot;
  • a signed copy shared with the other party, so that the record is agreed before anything changes.

A schedule describes. It doesn’t diagnose causes, give condition ratings or recommend repairs. Those belong in a survey or an investigation. Our guide to monitoring a crack explains how cracks are measured and recorded over time.

Timing

The whole value of a schedule depends on it being made before anything changes. One made after work has started can’t show what was there before. If the work is long or disruptive, a second visit at the end, comparing the building with the original record, closes the loop.

Who should prepare it

  • For party wall work, the record is part of the party wall process and is prepared by the appointed party wall surveyor or surveyors. We aren’t party wall surveyors and don’t serve notices or make awards. RICS’s member directory lists surveyors who do.
  • For anything else, the schedule should be prepared by someone independent, competent to describe buildings and their defects accurately, and ideally agreed with the other party so that it isn’t seen as one-sided.

How we can help

Outside the Party Wall Act, we can make a dated written and photographic record of your property’s condition: before neighbouring works, before your own project, or for a claim file. Where it helps, it can include a 360° capture of the rooms. This is a building consultancy instruction, so the scope, the format and the fee are agreed in writing before we visit. Tell us about the property and what is about to happen; we aim to reply within one working day.

Related service

Building consultancy

Independent opinion on building matters: remediation specifications, pre-purchase advice for complex properties and second opinions on reports.

About this serviceRequest a building consultancy quoteOr call 01484 218579

RICS-regulated firm no. 9317773

Free tools

Check your own property.

All free tools

Sources and further reading

Written by

Mills Building Consultancy

RICS-regulated firm no. 9317773 · Surveyors with RICS and CIOB membership · PCA Qualified Technician for damp and timber

We are an independent surveying and consultancy firm based in Huddersfield, West Yorkshire. Our work draws on combined experience across contracting, field surveying and complex insurance claims for homeowners, contractors, developers and insurers.

Share this guide

Not sure what the rules ask?