Free tool · Up to 4 questions · England and Wales

Do I need a party wall notice? Check before you build.

Lofts, extensions, chimney breasts and new foundations can all bring your neighbour into the project.

Tell us what you’re planning and how close you’ll dig, and we’ll show whether the Party Wall etc. Act 1996 is likely to apply, which notice you’d serve, how much notice to give, and what happens if your neighbour doesn’t reply.

Check your work

01What are you planning?

Pick the main job. If you’re doing several things, check each one.

02Is the boundary already built on?

Only matters for an extension or a new wall on the boundary. Look along the line where your wall would go.

03Will you dig near the neighbour’s building?

Measure horizontally from the nearest part of their building or structure — including an extension, garage or outbuilding — to your trench.

04Will it go deeper than their foundations?

Only matters if you’re digging within 6 m. Your designer or building control can usually tell you how deep your foundations need to be.

The three notices

Party wall notices side by side.

The three types of party wall notice compared
NoticeSectionCoversMinimum noticeIf no reply in 14 days
Line of junction noticenew wall on the boundarySection 1Building a new wall on or up to the boundary where the line isn’t already built on — a party wall or party fence wall astride it, or a wall wholly on your land.At least one month before work startsFor a wall astride the boundary, no written consent within 14 days means you may only build it wholly on your own land, at your own expense.
Party structure noticework to an existing party wallSections 2 and 3Work to an existing party wall, party structure or party fence wall: cutting in for beams or a damp-proof course, cutting away a chimney breast, raising, underpinning, thickening, repairing, demolishing and rebuilding.At least two months before work startsNo written consent within 14 days means a dispute is treated as having arisen, and surveyors are appointed.
Notice of adjacent excavation3 metre / 6 metre noticeSection 6Excavating within 3 m of a neighbour’s building or structure and deeper than the bottom of its foundations, or within 6 m and deep enough to cut a 45° line drawn down from the bottom of its foundations.At least one month before work startsNo written consent within 14 days means a dispute is treated as having arisen, and surveyors are appointed.

Your neighbour can agree in writing to work starting sooner, but doesn’t have to. Where one job needs more than one notice, plan around the longest period.

Section through a neighbour’s house, the ground and your excavation, showing the 3 metre and 6 metre zonesA sliced model of two houses and the ground between them. The neighbour’s wall sits on a strip foundation about 0.9 m deep. Measured horizontally from their wall, zone A covers the first 3 metres: digging there below the bottom of their foundations needs a notice. Zone B reaches out to 6 metres: digging there needs a notice if it would cut a line drawn down at 45 degrees from the bottom of their foundations, shown in ochre. Your trench for a new extension, 1.5 metres from their wall and 1.6 metres deep, goes below their foundations within 3 metres, so it needs notice.45°AB3 m6 m from their wallNeighbourYouNewextensionBoundaryTheirfoundationYour trench
  • Neighbour
  • You
  • New
    extension
  • Boundary
  • Their
    foundation
  • Your trench
  1. Neighbour’s house
  2. Your house
  3. New extension
  4. Boundary
  5. Their foundation
  6. Your trench
Fig. 2a · Section 6 zonesIllustrative cut through a neighbour’s house, the ground and your trench.
  1. A: Within 3 m of their wall — deeper than their foundations
  2. B: Within 6 m of their wall — cuts the 45° line from their foundations

Section 6 of the Act, cut through. Measured horizontally from their building: within 3 m, notice is needed if you dig below the bottom of their foundations (A); within 6 m, it’s needed if your dig would cut a line drawn down at 45° from the bottom of their foundations (B). Here, a trench for a new extension 1.5 m away goes below their foundations, so it needs notice.

Plan of a pair of semi-detached houses showing the party wall and the line of junctionTwo semi-detached houses seen from above, joined by a hatched party wall that sits astride the boundary between them. The boundary, called the line of junction in the Act, runs through the middle of the party wall and continues down the gardens.Rear gardenRear gardenNo. 1No. 2PartywallLine ofjunctionStreet
Fig. 2b · PlanIllustrative plan of a pair of semi-detached houses.

How it works

From notice to award.

  1. Serve the notice on each adjoining owner, describing the work and the date it will start.
  2. Your neighbour replies within 14 days, consenting or dissenting in writing.
  3. If they consent, the work can go ahead once the notice period has run. Agree a written record of their side’s condition first — photos help both of you.
  4. If they dissent or stay silent, a dispute is treated as having arisen. You either agree on one surveyor to act for both, or appoint one each and the two select a third.
  5. The surveyors make an award setting out what work can be done, how and when, and who pays. When the work is solely for your benefit, you’ll usually pay the surveyors’ fees.

Where we fit

Building advice, not party wall surveying.

Mills Building Consultancy isn’t a party wall surveyor, and we don’t serve notices or make awards. For that, find a party wall surveyor through RICS’s member directory — its consumer guide explains what to look for.

Where we can help is the building side: whether a wall is sound before you cut into it, what a chimney breast removal or loft conversion involves, and keeping an eye on an extension as it goes up through our extension and renovation oversight or building advice service.

More in our guides to party wall agreements and chimney breast removal, and what a schedule of condition records before the work starts.

Common questions · party walls

Asked about party walls.

Do I need a party wall agreement?

What people call a “party wall agreement” is usually one of two things: your neighbour’s written consent to your notice, or a party wall award made by surveyors when a dispute arises. If the Act applies, you must serve notice either way. If your neighbour consents in writing, no surveyors or award are needed — though a record of the condition of their side before work starts is still sensible.

Is there a party wall notice template?

Yes — the GOV.UK explanatory booklet on the Party Wall etc. Act 1996 includes example letters for a party structure notice, a line of junction notice and a 3 or 6 metre notice, plus example replies for your neighbour. We don’t provide our own template: use the official examples, or have a party wall surveyor prepare and serve the notice for you.

How much notice do I have to give for party wall work?

At least two months for work to an existing party wall (a party structure notice), and at least one month for a new wall on the boundary (a line of junction notice) or for nearby excavation (a 3 or 6 metre notice). A party structure notice lapses if the work hasn’t started within 12 months. Work can start sooner only if your neighbour agrees in writing.

Do I need a party wall notice to knock through?

If the new beam or steel will bear on the party wall, yes. Cutting into a party wall to take the end of a beam, or a padstone under it, is work to a party structure under section 2 — even though the hole is on your side — so a party structure notice is needed at least two months before work starts. If the beam bears only on walls that are wholly yours, the Act usually isn’t involved, though removing a load-bearing wall still needs Building Regulations approval and an engineer’s design.

What happens if my neighbour doesn’t respond to a party wall notice?

Your neighbour has 14 days to reply in writing. For a party structure notice or an excavation notice, silence after 14 days is treated as a dispute, and surveyors must be appointed — either one agreed surveyor, or one each who then select a third. For a new wall astride the boundary, silence means you can only build the wall wholly on your own land.

Does the Party Wall Act apply in Scotland or Northern Ireland?

No. The Party Wall etc. Act 1996 applies in England and Wales only. And it’s separate from planning and Building Regulations: getting planning permission or Building Regulations approval doesn’t remove the need to serve notice, and agreeing things with your neighbour doesn’t remove the need for approvals.

Sources and further reading

Where this comes from.

  1. Party Wall etc. Act 1996The full Act on legislation.gov.uk, including section 1 (new walls on the line of junction), section 2 (work to party walls), section 3 (party structure notices), section 6 (adjacent excavation) and section 10 (resolving disputes).
  2. The Party Wall etc. Act 1996: explanatory bookletThe government’s plain-English guide, with example notice letters and replies (GOV.UK).
  3. Party walls and building workGOV.UK’s overview, including work you must tell your neighbour about.
  4. Party wallsRICS consumer guide, and its find a member directory.

Planning work next door?

Get the building side right.

Before you cut into a shared wall or dig near a neighbour, get practical advice on the building itself. For notices and awards, appoint a party wall surveyor.

Fixed quote before you commit

We aim to reply within one working day.